 |
De Uithof, showcase of modern architecture
|
 |
| Address |
Leuvenplein 10 - 322
|
| Architect |
Marlies Rohmer
|
| Year |
• 2006 - 2008
• First pile: Jun. 29, 2006
• Official start of the construction works: Oct. 3, 2006
• Collapsing building crane: Jan. 18, 2007. A Terex Peiner
SK 415 tower crane had been installed on the site. On Jan. 18th
2007 there were strong winds of up to 130 km/h. The crane could
rotate freely in the wind but at 11.10 a.m. it was reported
to be in the wrong position and it collapsed on the neighbouring
'Ruppertbuilding' causing immense damage and a number of injured,
• Highest point: Mar. 5th, 2008
• First inhabitants: Nov. 2008,
• Fully inhabited: Dec. 2008
|
| Use |
Casa Confetti consists of 257
units of 30 m2 to be used individually and 120 student rooms with
shared facilties of 17,5 m2 each. Three or four rooms are grouped together.
In addition, there are a number of commercial spaces for entrepreneurial
starters. The latter are situated at the front of the building
near the Heidelberglaan. These spaces are are rented out to: a health centre, a hairdresser and to UtrechtInc.
|
| Awards |
Nomination Rietveldaward 2009 (public)
|
| Relevant websites |
• Google Sketchup 3D-model by Wouter van Faassen. Download kmz-file for viewing in Google Earth.
• Computer rendering of interior.
|
| Opened |
2008
|
| Sq. metrage |
| 18.600 sq.m., volume: 57.100 m3. |
| Cost |
16,5 million € (VAT excuded)
Although Casa Confetti was commisioned by SSH, its funding
is based on a cooperation of 17 housing corporations.
They are the joint owners: Beter
Wonen Vechtdal (Hardenberg), Betuws Wonen (Culemborg /
Geldermalsen), Bouwvereeniging Volksbelang (Vianen), Patrimonium
(Veenendaal), Rhenense Woningstichting, De Seyster Veste
(Zeist), SSH Utrecht, Sité Woondiensten (Doetinchem),
Stichting Clavis (Terneuzen), Westhoek Wonen (Mijdrecht),
Woonlinie (Woudrichem), Woningstichting Nijkerk (Nijkerk),
Woningstichting De Vijf Gemeenten (Hedel), Woongoed Zeeuws
Vlaanderen (Terneuzen), Woonmaatschappij Maasland (Ravenstein),
Woonstichting SSW (De Bilt), IJsselsteinse Woningbouwvereniging. |
| Contractors |
BAM Woningbouw
|
| Landscape designer |
| |
| General information |
The building has
15 floors and rises to 48 meters. On the top floor, a roof
terrace of 610 m2 is created. The entrance of the building
is painted in a striking green color and it protrudes approximately
8 meters above the ground level. To enable the building of
Casa Confetti part of the 'Bestuursgebouw'
of the university had to be demolished during the first months
of 2006.
|
| The name of the building |
| The residence takes its name from the
multi-coloured aluminum skin. At earlier stages the project
was also called 'smarties' for the same reason and 'the beast'
because of its multi-legged structure. |
|
| These digitalia are best
viewed in Century Gothic. |
|
| |
|
| |
|
|
 |